6 Feb
2013
6 Feb
'13
5:43 p.m.
Jerome Nicolle wrote:
In non-dense areas, zone operators have to build concentration points (kind of MMRs) for at least 300 residences (when chaining MMRs) or 1000 residences (for a single MMR per zone). Theses MMRs often take the form of street cabinets or shelters and have to be equiped with power and cooling units to enable any ISP yo install active equipments (either OLT or ethernet switch).
How is the wiring between the concentration points and residences? Masataka Ohta