Actually that time estimate is pretty accurate. When I was at Cascade, I put together a program that did this in about a month. The program was written in C++, with tcl used for command line entry, and SQL hooks for accessing the Cascade topology database. If I took out the SQL hooks, 2-3 weeks would have been spot on. In addition to doing traffic engineering analysis (including various failure and reroute scenarios that modeled Cascade's circuit routing algorithms), the program automatically populated its initial topology with a SQL database from an actual network. A modification to translating this to asymmetric IP flows would have been straightforward. And no, I didn't take the code with me to my current company. Prabhu Patrick Greenwell wrote:
On Thu, 21 Oct 1999, Bora Akyol wrote:
If you don't want a GUI and the fancy what if scenarios, it is not difficult to write a Perl/Script that does constraint-based routing or Multi-commodity flow problems.
I would guess 2-3 weeks if one is familiar with basic linear programming.
If I had a dime for everytime someone claimed that a piece of software offering such-and-such functionality could be written in X time period (where X is a few hours to a month)....
When you have your hypothetical software written, please let me know. I'd love to check it out.
/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\ Patrick Greenwell "This is our time. It will not come again." \/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/
-- ---------------------------------------------------------------------- Prabhu Kavi Phone: 978-264-4900 x125 Director, Prod. Mgmt. FAX: 978-264-0671 Tenor Networks Email: prabhu_kavi@tenornetworks.com 50 Nagog Park WWW: www.tenornetworks.com Acton, MA 01720 ----------------------------------------------------------------------