The building is run / managed by RACO. Bell along with pretty well every carrier in Canada are tenants of the building. Its a VERY large carrier POI. I spoke with GT at 3:30 Eastern and they still were waiting for some contractors to show up to fix the air conditioners. Street power was supposedly restored around ~ 1am but still no cooling :-( ---Mike At 03:46 AM 15/08/2003 -0400, Bill Zeng wrote:
That's a shame to owner/Bell. Generators should have been tested with the full load on a periodic basis.
On Thu, 14 Aug 2003, Mike Tancsa wrote:
Yikes, I just heard that the power is out at 151 Front St because they are having generator problem.
---Mike
At 11:04 PM 14/08/2003 -0400, Mike Tancsa wrote:
Does anyone know whats up with them ? All my peers are down now and the host for the mailing list is still off the air.
---Mike -------------------------------------------------------------------- Mike Tancsa, tel +1 519 651 3400 Sentex Communications, mike@sentex.net Providing Internet since 1994 www.sentex.net Cambridge, Ontario Canada www.sentex.net/mike