28 Jul
2008
28 Jul
'08
5:48 p.m.
And I would reckon that laying fibre along existing utility poles to reach 200 homes would cost far less than laying fibre in a concrete high rise appartment building to reach 200 appartments.
Problem is not laying fiber between poles, the last mile has been always the show killer.
200 local loops + terminating equipment surely will cost more than 1 local loop + terminating equipment. My .02